Titelangaben
Liske, Thomas ; Kuhn, Heinrich:
The Economic Lot and Supply Scheduling Problem under a Power-of-Two Policy.
In: Fleischmann, Bernhard ; Borgwardt, Karl-Heinz ; Klein, Robert ; Tuma, Axel (Hrsg.): Operations Research Proceedings 2008 : Selected Papers of the Annual International Conference of the German Operations Research Society (GOR) University of Augsburg, September 3-5, 2008. -
Berlin : Springer, 2008. - S. 215-220
ISBN 978-3-642-00141-3 ; 978-3-642-00142-0
Kurzfassung/Abstract
The paper presents a new problem class, the Economic Lot and Supply Scheduling Problem (ELSSP). The ELSSP deals with the simultaneous vehicle routing and production planning and is an extension of the classical ELSP. To solve the described problem the junction point method from Yao and Elmaghraby for the solution of the ELSP under a power-of-two policy is modified and extended in order to consider the vehicle routing problem caused by the deliveries of the input-materials.
Weitere Angaben
Publikationsform: | Aufsatz in einem Buch |
---|---|
Sprache des Eintrags: | Deutsch |
Institutionen der Universität: | Wirtschaftswissenschaftliche Fakultät > Betriebswirtschaftslehre > ABWL, Supply Chain Management & Operations |
Titel an der KU entstanden: | Ja |
KU.edoc-ID: | 750 |
Letzte Änderung: 20. Aug 2012 15:31
URL zu dieser Anzeige: https://edoc.ku.de/id/eprint/750/